Author: admin

GPDP 3, DOE, and PIA-HSSE IMT Member Agencies Pilot-Test its Integrated Inspection and Monitoring Manual at First Gen Terminal

The Gas Policy Development Project 3 (GPDP 3), in coordination with the Department of Energy (DOE), conducted a pilot test inspection run of the Integrated Inspection and Monitoring Manual (IIMM) for the PIA-HSSE IMT Member-Agency on 20 February 2026 during a site visit at the First Gen LNG Terminal in Batangas City.  Prior to this, […]

GPDP 3, Partner Agencies Align towards a Unified LNG Inspection Manual

The Gas Policy Development Project Phase 3 (GPDP 3) successfully conducted Workshop 1 on the development of the Integrated Inspection and Monitoring Manual (IIMM) on 23 January 2026 at The Bayleaf Intramuros. This activity brought together the PIA-HSSE-IMT member agencies directly involved in the governance of LNG facilities and terminals to align and integrate their […]

Techno-Economic Feasibility of the Natural Gas Use in Special Economic Zones

This study mapped the infrastructure of non–natural gas facilities among Batangas manufacturing SEZs, determined the logistics for delivering LNG to these zones, and assessed the feasibility of small-scale LNG-based power systems. Findings emphasized practical delivery models and cost scenarios that could attract investment and facilitate adoption.